Artillery

South Korea’s Highly Mobile 155mm Artillery System Wins U.S. Army Howitzer Contract

The U.S. Army has chosen Hanwha Defense USA to advance to the next phase of its Mobile Tactical Cannon (MTC) program. The company will now provide prototypes of its wheeled 155mm K9 Mobile Howitzer for further testing. This, in turn, could lead to its adoption as a replacement for the Army’s existing towed 155mm M777 howitzers.

“The U.S. Army announced today an agreement with Hanwha Defense USA, Arlington, Virginia, for the development of prototypes for the Mobile Tactical Cannon program, a critical priority in the Army’s ongoing continuous transformation and long-range fires modernization efforts,” according to a press release the service put out this evening. “Awarded competitively under an Other Transaction Authority (10 U.S.C. Section 4022), the firm-fixed-price agreement will provide the Army with up to 18 wheeled Self-Propelled Howitzer Systems for rapid prototyping, testing, and Soldier experimentation over an estimated four-year period of performance. The amount of this action is $100,302,961 with a total cumulative face value of $262,903,274.”

A stock picture of Hanwha’s wheeled 155mm K9 Mobile Howitzer. Hanwha

OTAs are a contracting mechanism that U.S. government agencies regularly use to help accelerate advanced research and development and prototype efforts.

The Army’s release does not explicitly mention the K9 Mobile Howitzer (K9MH), also known as the K9A2. However, Hanwha Defense USA has confirmed that this is the design it will be supplying in its own press release. The company had also announced this would be its entry for the MTC competition back in March. American Rheinmetall, BAE Systems, General Dynamics Land Systems, and Elbit Systems USA had also been in the running.

“The agreement provides for the accelerated delivery of six prototype MTC systems, with an option for an additional 12. Soldiers will use these platforms in a series of operational experiments to assess performance, reliability, and supportability in realistic combat conditions,” the release adds. “This Soldier-centric, experiment-driven approach reflects the Army’s continuous transformation initiative to rapidly deliver lethal capabilities, incorporate immediate Soldier feedback, and adapt the force to pace emerging threats in multi-domain operations.”

The K9MH was developed from Hanwha’s earlier tracked K9 design, variants and derivatives of which are already in service in South Korea, as well as Australia, Egypt, Estonia, Finland, India, Norway, Poland, and Turkey. Both the tracked and wheeled designs share the same 52-caliber 155mm cannon. Caliber here is a measurement of length in relation to the diameter of the barrel. A 52-caliber 155mm barrel is just under 26 and a half feet long. The M777’s barrel is 39 calibers long, or just around 16.7 feet.

K9 and K10 prove compatibility with US munitions during a live-fire demonstration at YPG thumbnail

K9 and K10 prove compatibility with US munitions during a live-fire demonstration at YPG




In general, longer barrels on howitzers translate to greater range. Hanwha says the maximum range of the K9MH is just over 37 miles (60 kilometers), though it is unclear if this is only when using rocket-assisted or other specialized ammunition. The stated maximum range of the M777, even when using specialized rounds, is just under 20 miles.

As a self-propelled howitzer, the 8×8 K9MH also offers the benefit of integrated mobility over the towed M777, which requires a separate vehicle to move it from point A to point B. “Its emplacement/displacement times of under 30 seconds enables ‘shoot and scoot’ tactics,” according to Hanwha’s website.

The K9MH can also carry 40 rounds of ammunition onboard, as well as be rapidly reloaded in the field via a companion K10 resupply vehicle.

“We’re focused on creating a U.S.-anchored K9 Mobile Howitzer manufacturing network – with Opelika, Alabama, as the current phase I launch point – that can deliver advanced Mobile Tactical Cannons at the speed and scale the U.S. Army needs,” Jason Pak, Hanwha Defense USA Head of Land Systems-Artillery, also said in a statement.

“Hanwha’s global supply chain and local production experience in Australia, Egypt, Poland and Romania demonstrate a proven commitment to local execution we’re excited to bring to the U.S.,” Michael Coulter, Hanwha Defense USA CEO, said in his own statement. “Localization is central to Hanwha’s global business model, leveraging our global leading industrial technology and process in Korea to create sovereign industrial strength in the U.S., whether it be in shipbuilding, munitions or combat vehicles.”

The Army has been actively exploring the idea of replacing the M777 with a new wheeled self-propelled howitzer since at least 2019, and has even conducted shoot-offs of various designs in the past. The service has also made clear that its selection of Hanwha Defense USA to advance in the MTC effort does not guarantee that it will field the K9MH.

US Army soldiers train with an M777 towed howitzer. US Army

“Data and insights gained from these experiments will directly inform senior leaders’ decisions on future fielding. If approved for fielding, MTC will replace M777 towed artillery systems in select formations, significantly increasing their lethality, mobility, reliability, and survivability on the modern, highly transparent battlefield,” per the Army’s release today. “By rapidly prototyping these systems, the Army is advancing a more mobile and adaptable fires formation aligned with the rigorous demands of large-scale combat operations.”

The release does not elaborate on what “select formations” might be in line to eventually receive K9MHs. However, a past MTC contracting notice says the initial focus is on replacing M777s within Brigade Combat Teams equipped with Stryker wheeled light armored vehicles. Airborne, airmobile, and ‘leg’ infantry brigades also have M777s that could be supplanted by new wheeled self-propelled howitzers.

The possibility of the Army replacing at least a portion of its existing M109-series tracked self-propelled 155mm howitzers has also been raised in the past. However, the service’s press release today makes clear that the focus of the MTC program right now is still on replacing towed M777s. There is a long-standing debate about the relative pros and cons of wheeled versus tracked self-propelled howitzers, with the U.S. Army long having favored the latter. Tracked designs typically offer greater off-road mobility and are often more heavily armored. They are also generally heavier overall, which can negatively impact mobility and transportability more broadly, and can be more costly to acquire and operate.

A current-generation version of the M109 in US Army service. US Army

“If you look at the [fight] in Ukraine on either side, it’s really hard to move out and get fires ready to go. … The Paladin [the name applied to the latest A6 and A7 variants of the M109] is just incapable of it at speed,” Secretary of the Army Dan Driscoll told members of the House Appropriations Committee at a hearing earlier this year. “And so while we think the Paladin will be in our lives for a while, because we want to be good custodians of the assets the American taxpayer has given us, we think that new purchases to balance that platform out should be something different.”

At that time, Driscoll was defending his service’s omission of funding for any more M109A7s in its Fiscal Year 2027 budget proposal.

It is worth noting here that both sides in the ongoing conflict in Ukraine have and continue to employ tracked and wheeled self-propelled howitzers, as well as towed types. The war has underscored the continued importance of artillery, in general. At the same time, mobility, and greater speed while on the move, are ever more important considerations in an era of drone warfare and expanded kill chains that put anything that stays in one place too long at higher risk

MTC is part of a larger Self-Propelled Howitzer-Modernization (SPH-M) effort that could also include the separate acquisition of a new tracked self-propelled howitzer. There have been several abortive Army attempts to replace the venerable M109 family since the 1990s. This includes the advanced XM2001 Crusader, which was canceled in 2002 ostensibly due to growing costs. The service axed the more recent XM1299, developed under its Extended Range Cannon Artillery (ECRA) program in 2024. The XM1299 featured a 58-caliber cannon and had a demonstrated range of 40 miles (just over 60 kilometers). The Army has previously said that the length of the barrel presented technical challenges that contributed to the program’s cancellation.

XM2001 Crusader Howitzer Prototype thumbnail

XM2001 Crusader Howitzer Prototype




A prototype the US Army had used in the development of the XM1299. US Army

Since the XM1299’s cancellation, the Army has also been investing heavily in new long-range artillery shells, including ramjet-powered types.

Today’s announcement is also another important win for South Korea’s defense industry, which has made major export gains globally in recent years. Poland, in particular, has become a huge customer for South Korean arms exports, including versions of the K9. Further progress in the U.S. Army’s MTC program could offer a major inroad into the American market for Hanwha.

With today’s announcement, the Army has taken an important new step toward adding a new wheeled 155mm self-propelled howitzer to its arsenal.

Contact the author: joe@twz.com

Joseph is TWZ’s Deputy Editor, helping to oversee the site’s highly experienced and dedicated team, while also writing informative and impactful defense and national security content. He lives right in the thick of it in the Washington, D.C. area.


Source link

New $500M Artillery Shell Plant Failed To Produce Any 155mm Parts

The inability of a munitions plant in Mesquite, Texas, to build a key part set back the U.S. Army’s plans for ramping up production of 155mm shells to 100,000 rounds per month, according to a scathing new report by the War Department’s Office of Inspector General (DOWIG). Despite receiving close to $500 million from the U.S. Army funded through supplemental spending bills from Fiscal Years 2022 and 2023, General Dynamics Ordnance and Tactical Systems (GD-OTS), failed to make a single subcomponent needed to produce the badly needed shells as of last March.

“Without the 30,000 additional projectile metal parts anticipated from the Mesquite facility, the Army will be unable to reach its monthly capability goal of 100,000 155-mm artillery rounds,” the report concluded. “As of March 2026, the CPE A&E [Capability Program Executive Ammunition & Energetics] officials have not developed a plan to produce the additional rounds that are supposed to be produced at the Mesquite facility.”

At present, the Army is only producing 36,000 rounds per month, inspectors revealed.

Through modernization efforts and two new facilities, the Army expects to exceed the 100,000-round-per-month goal significantly by the end of next year. The initial goal was established by Congress in the wake of the U.S. providing millions of rounds to Ukraine.

Still, the report highlights the challenges U.S. arms makers face in trying to meet tighter timelines to produce more weapons. This all comes as the U.S. is increasingly concerned about stockpiles of a wide array of munitions after heavy usage in past and current conflicts and donations to partners like Ukraine, as well as foreign military sales. These are issues that we raised long before and during the current war with Iran, but they have become major headlines in the aftermath of the initial stages of that conflict.

The plant at the center of this new report is the Universal Artillery Projectile Line owned and operated by General Dynamics Ordnance and Tactical Systems. It opened in May 2024 to great fanfare and high hopes.

Then-Secretary of the Army Christine Wormuth toured the Universal Artillery Projectile Line (UAPL) during the opening ceremony in Mesquite, Texas, on May 29, 2024. (U.S. Army photo by Sgt. 1st Class Nicole Mejia)

According to the IG report, more than three million 155mm shells were donated to Ukraine, more than 111,000 rounds were used over the past four years on training and testing, and nearly 218,000 rounds were sold to foreign customers. Combined, U.S. stocks were depleted by more than 3.6 million rounds since the start of the war in Ukraine.

A soldier from an artillery unit of the 152nd Symon Petliura Jaeger Brigade of the Ukrainian Land Forces installs fuses during a combat mission in the Pokrovsk direction in Donetsk region, Ukraine, on December 11, 2025. (Photo by Dmytro Smolienko/Ukrinform/NurPhoto via Getty Images) NO USE RUSSIA. NO USE BELARUS. (Photo by Ukrinform/NurPhoto via Getty Images)
A soldier from an artillery unit of the 152nd Symon Petliura Jaeger Brigade of the Ukrainian Land Forces installs fuzes during a combat mission in the Pokrovsk direction in Donetsk region, Ukraine, on December 11, 2025. (Photo by Ukrinform/NurPhoto via Getty Images) NurPhoto

The Mesquite plant was opened to help replenish the supply. However, according to DOWIG, it failed to live up to expectations.

“The DoW increased its capability and capacity to produce 155-mm artillery ammunition but did not reach the 2025 National Defense Industrialization Strategy Implementation Plan goal of 100,000 rounds per month by October 2025,” the DOWIG report pointed out.

As of March 2026, “the Army had increased its monthly production from 14,000 to 36,000 rounds because of expansion and modernization efforts at both the projectile metal parts and the load, assemble, and pack facilities,” the IG report noted. “However, at a contractor-owned, contractor-operated facility in Mesquite, Texas, the contractor has been unable to produce any projectile metal parts that meet contract specifications.”

According to an Army news release about the plant opening, it was built to “feature high-volume production capabilities for large-caliber metal parts and is equipped with long-stroke, high-tonnage forging capabilities.”

“The facility’s 155mm metal parts production lines also meet Army modernization goals by incorporating high levels of automation, modern manufacturing practices, and digital-data-capture ability. It will offer the flexibility to produce a variety of metal parts ranging from 60mm to 155mm, with minimal changeover requirements,” the Army added.

Machinery inside the Mesquite, Texas, plant designed to produce larger-caliber metal parts, equipped with long-stroke, high-tonnage forging capabilities. (U.S. Army photo by Sgt. 1st Class Nicole Mejia)

The Army “planned for the Mesquite Texas facility to produce 30,000 rounds per month,” the report added. “With only three facilities producing the required projectile metal parts, the DoW will reach only 71,000 rounds per month, or 71 percent of its monthly production capacity goal for 155-mm artillery rounds.”

We’ve reached out to General Dynamics and the Army for comment and will update this story should the company respond.

The main issue inspectors found was that the plant adapted equipment used to make parts for M107 155mm shells to produce parts for M795 155‑mm shells. The latter is an upgraded version of the munition that is slightly heavier and longer, and has an extended range.

M107 155mm high explosive cartridge. (Army)
Army

As a result of this adaptation, several factors came into play, according to DOWIG. Army officials knew that the concept of trying to produce the more advanced 155mm shells using equipment not designed for that was risky. However, officials felt that would pay off because that machinery was already available. In addition, the report stated that the existing Scranton plant’s past work with GD-OTS on ammunition production was a factor in deciding to take a chance on what turned out to be a flawed assumption.

The report states, in part:

  • According to the Army’s CPE A&E, “ACC issued the contract and CPE A&E accepted the risk associated with the contractor’s plan to purchase and adapt M107 metal part production equipment to produce a newer variant of the 155-mm projectile metal parts at different specifications.”
  • “According to CPE A&E officials, the Mesquite facility was a high-risk, high-reward opportunity, and CPE A&E is realizing some of that risk now because the facility has been unable to produce acceptable rounds.”
  • “CPE A&E accepted the contractor’s proposal to acquire and adapt unique production equipment and an unproven production process because equipment was already available. According to the CPE A&E official, obtaining and adapting the available production line equipment was expected to be faster than obtaining new M795 production line equipment.”
  • “The contractor has been working since the original contract task order was issued in November 2022 to produce the contracted 155-mm projectile metal parts. However, according to CPE A&E officials, acquiring the equipment and adapting it to produce M795 155-mm projectile metal parts resulted in significant challenges.” The report redacted specific examples.
  • “In addition, according to CPE A&E officials, CPE A&E recommended the contractor for the Mesquite facility because the contractor has 20 years of experience producing 155-mm projectile metal parts at the Scranton Army Ammunition Plant.”
  • “Scranton Army Ammunition Plant officials stated that despite the contractor’s years of experience, the Scranton facility encountered separate ongoing problems with the contractor in terms of responsiveness, equipment maintenance, and timeliness.”
  • “Those officials expressed concern to the evaluation team that ACC did not open the contract for the Mesquite facility to competition from other contractors.”
  • “In addition, according to ACC officials, the contract for the Mesquite facility was issued as a task order under the property management contract for the Scranton Ammunition facility and not as a separate contract.”
TOPSHOT - An employee handles 155 mm caliber shells after the manufacturing process at the Scranton Army Ammunition Plant (SCAAP) in Scranton, Pennsylvania on April 16, 2024. In brick buildings that are more than a century old, nearly in the heart of Joe Biden's Rust Belt hometown of Scranton, Pennsylvania, dated machinery churns artillery for modern conflicts, especially the war in Ukraine. The Scranton Army Ammunition Plant (SCAAP) is making steel tubes for 155 mm caliber shells, which are crucial to Kyiv's efforts to face down Moscow's invasion. (Photo by Charly TRIBALLEAU / AFP) (Photo by CHARLY TRIBALLEAU/AFP via Getty Images)
An employee handles 155 mm caliber shells after the manufacturing process at the Scranton Army Ammunition Plant (SCAAP) in Scranton, Pennsylvania on April 16, 2024. (Photo by Charly TRIBALLEAU / AFP) CHARLY TRIBALLEAU

The Army did not dispute that the Mesquite factory was not producing the needed parts.

“The Capability Program Executive Ammunition & Energetics will correct issues identified in this report, and develop and implement a corrective action plan,” CPE A&E responded.

The “United States Army concurs with the report as written,” the Assistant Secretary of the Army, Acquisition, Logistics and Technology stated.

Army Contracting Command (ACC), however, took issue with how the relationship between the Scranton and Mesquite plants was characterized. In its response, ACC stated that no one reached out to them to question GD-OTS’s plan and that it had received sign off from higher authorities to execute the contract without Congressional approval. Moreover, ACC added that it did not need to open up competition for the new plant.

The ACC response says:

  • “It is unclear what parties or organization are being referred to by ‘SCAAP officials,’ so it cannot confirm the accuracy of this information, however, ACC-RI would like to clarify that at no point did anyone question or raise concerns to ACC in terms of the acquisition strategy to award this effort to the contractor under the existing Scranton facility effort. Further, ACC-RI did document the contract file with a Determination of Contractor Responsibility in accordance with FAR 9.104 prior to award of these task orders.”
  • “ACC-RI received concurrence and approval on the acquisition strategy to execute these efforts on a sole source basis under W52P1J-19-D-0075 from the requiring activity, the Deputy Assistant Secretary of the Army-Procurement, and the Office of General Counsel, with notification provided to Congress prior to execution.”
  • “ACC-RI would like to clarify that while some might refer to W52P1J-19-D-0075 as the ‘Property Management contract for the Scranton Ammunition facility,’ the scope of the contract states that it covers operation, maintenance, and modernization; includes Production Based Support projects; and doesn’t require active operation at Scranton.” 
  • “The contract states that ‘The Property Management of SCAAP can be accomplished either through active operation of the Government-Owned, Contractor-Operated facility or layaway maintenance’ and allows the contractor to operate the contract at a privately-owned facility. As such, ACC-RI already determined it in scope to execute the Universal Artillery Projectile Line requirement as separate task orders under W52P1J-19-D-0075 and documented such in-scope determinations in memorandums within the contract file.”
Then-Secretary of the Army Christine Wormuth on a tour of the General Dynamics Ordnance and Tactical Systems Mesquite, Texas, facility during its grand opening. (Photo Credit: Sgt. 1st Class Nicole Mejia)

Problems with the plant were emerging even before the DOWIG released its report.

In February, Brent Ingraham, Assistant Secretary of the Army for Acquisition, Logistics, and Technology, complained to lawmakers about the inability of the plant to produce needed parts.

“First, let me start by saying I’m not happy with where we are at Mesquite either, right?” he testified. “So I’m in the same boat you are.” 

The Army was considering scrapping GD-OTS’s contract to manage the production lines in Mesquite, but Ingraham said the service ultimately did not go through with it, according to Breaking Defense. The Army is still in negotiations with the company, he said at the time.

“I anticipate you will see an investment from the company themselves, from the industry partner themselves, to ensure they can continue to build out that facility that would make rounds that would primarily be supported by the [foreign military sales],” Ingraham said. “But we are currently in negotiation [on] what that looks like, both from a line perspective, a quantity perspective, and hopefully we’ll have that wrapped up soon.”

(DOWIG)

A month ago, General Dynamics announced it would “invest $200 million of its own money and unwind a partnership with Turkish defense contractor Repkon in a bid to finally start producing 155mm artillery shells at a Texas plant that’s been beset by delays,” Bloomberg News reported, citing people familiar with the matter.

The factory “has joined a long list of US defense programs that have failed to meet the lofty goals set out for them,” the publication added.

Munitions manufacturing equipment provided by Repkon “had failed to meet required standards and will be replaced by hardware and management from Deterrence Defense, a privately-held company based in Fremont, Calif.,” Bloomberg added. “General Dynamics and the US Army ‘have reached an agreement on a path forward, which includes additional investment,’ the company said in a statement without disclosing the amount.”

As we noted earlier in this piece, despite the problems at the Mesquite plant, the Army projects that it will turn things around by next year.

“According to Army officials, the Army did not reach its goal for increased capability and capacity to load, assemble, and pack 155-mm artillery ammunition,” investigators found. “However, through the modernization of the Iowa Army Ammunition Plant and the addition of two new facilities in Kansas and Arkansas, the Army is on track to increase its capability and capacity to load, assemble, and pack 140,000 155-mm artillery rounds per month by December 2027. This exceeds the NDIS Implementation Plan goal by 40,000 rounds per month.”

Still, that’s more than a year away and, as we noted earlier in this story, about 14 months later than the Army was expecting to receive these shells. Whether it can meet these revised goals remains to be seen.

Contact the author: howard@twz.com

Howard is a Senior Staff Writer for TWZ. He writes frequently about conflict, focusing heavily on the Middle East and Ukraine, and interviews with military and intelligence officials and industry leaders from around the globe. He lives near Tampa, Florida, home of U.S. Central Command, U.S. Special Operations Command.




Source link