Lunar

Artemis II enters moon’s sphere of influence ahead of lunar flyby

April 6 (UPI) — The four crew members of the Artemis II mission entered the moon’s sphere of influence early Monday, marking the start of their lunar flyby.

The Orion spacecraft reached what is called the lunar sphere of influence at about 12:41 a.m. ET Monday, meaning the moon’s gravitational forces on the capsule were greater than those of Earth.

The mission launched Wednesday from Florida, and it took the spacecraft four days, six hours, two minutes and 54 seconds to cross the important gravitational milestone, the first crewed mission to enter the moon’s sphere of influence since Apollo 17 in 1972.

About 13 hours later, at 1:56 p.m., the four-person crew of NASA astronauts Reid Wiseman, Victor Glover and Cristina Koch, and Canadian Space Agency astronaut Jeremy Hansen will have surpassed the record for the farthest humans have traveled from Earth, which was previously set by Apollo 13 in 1970.

The spacecraft is expected to start its flyby of the moon at about 2:45 p.m. Monday, when a seven-hour lunar observation period will begin.

NASA said the crew will see both the near and far sides of the moon during this period. As window space is limited, the crew will be divided into pairs that will conduct between 55- and 85-minute observation shifts, it said.

Mission control sent the crew the final list of lunar surface features to be observed and photographed during the flyby early Sunday, according to NASA.

The astronauts will be tasked with observing about 30 targets, including the Orientale basin, a nearly 600-mile-wide crater that spans the boundary between the moon’s near and far sides, NASA said.

“The crew will study Orientale’s features up close and from multiple angles as they pass by,” the space agency said in a Sunday evening blog post.

Orion is expected to reach its closest approach to the moon at 4,070 miles at 7:02 p.m. only to reach its maximum distance from Earth during the mission minutes later.

The lunar observation period is expected to come to an end at 9:20 p.m.

At about 1:25 p.m. Tuesday, Orion will have exited the lunar sphere of influence en route home.

The 10-day moon flyby mission is to conclude with a splashdown off the coast of San Diego at about 8:07 p.m. Friday.

Source link

NASA announces accelerated plan to build moon base, skip lunar space station

March 24 (UPI) — NASA on Tuesday announced plans to spend $30 billion on a permanent lunar base and send astronauts to the moon every six months after the Artemis V mission.

Speaking at a so-called “Ignition” event at NASA headquarters in Washington, D.C., Administrator Jared Isaacman discussed plans to accelerate construction of a moon base.

“There will be an evolutionary path to building humanity’s first permanent surface outpost beyond Earth,” he said.

“NASA is committed to achieving the near-impossible once again: to return to the moon before the end of President [Donald] Trump’s term, build a moon base, establish an enduring presence, and do the other things needed to ensure American leadership in space.”

NASA’s plan was initially to focus on what it called the Gateway program — a space station that was going to orbit the moon. Then the agency would build a base on the moon.

Carlos Garcia-Galan, the program executive for NASA’s Moon Base program, said the systems and hardware already established for the Gateway program would be repurposed to build the moon base.

Isaacman said the moon base plan will comprise three phases.

The first phase would include a series of missions to send small robotic landers and vehicles astronauts can drive on the surface to the moon. It would also encompass communications and scientific instruments.

The second phase would involve the construction of a “semi-habitable infrastructure” for astronauts on the lunar surface.

The third phase would start construction of a more permanent structure.

The first two phases would involve an investment of $20 billion over the next seven years and dozens of missions to the moon. The third phase would cost another $10 billion.

“The moon base will not appear overnight,” Isaacman said.

Isaacman said NASA also plans to launch a nuclear-propelled spacecraft to Mars by 2028.

NASA’s launch window for Artemis II is set to open April. The crewed mission is expected to send the Space Launch System and Orion spacecraft to orbit the moon over 10 days and return to Earth. The crew will test whether the spacecraft operates in deep space.

The long-term goal of the Artemis program is to re-establish a human presence on the moon in preparation for the ultimate aim of putting a human on Mars.

NASA’s Space Launch System rocket emerges on Saturday morning from the Vehicle Assembly Building to start its journey to Launch Complex 39B at the Kennedy Space Center in Florida. Photo by Joe Marino/UPI | License Photo

Source link