The content in this section is supplied by GlobeNewswire for the purposes of distributing press releases on behalf of its clients. Postmedia has not reviewed the content.
You can save this article by registering for free here. Or sign-in if you have an account.
Article content
Infill Drill Highlights: AZ24375:217 metersof1.11 % Cu, incl.100 metersof1.32 % Cu AZ24335:158 metersof0.84 % Cu, incl.78.5 metersof1.10 % Cu AZ24403:276 metersof0.86 % Cu, incl.160 metersof0.96 % Cu AZ24320:146 metersof0.89 % Cu AZ24332:119.6 metersof0.72 % Cu
TORONTO, Aug. 08, 2024 (GLOBE NEWSWIRE) — McEwen Copper Inc., 48.3% owned by McEwen Mining Inc. (NYSE: MUX) (TSX: MUX), is pleased to comment on the excitement in Argentina that includes:
Advertisement 2
This advertisement has not loaded yet, but your article continues below.
THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY
Subscribe now to read the latest news in your city and across Canada.
Exclusive articles from Barbara Shecter, Joe O’Connor, Gabriel Friedman, and others.
Daily content from Financial Times, the world’s leading global business publication.
Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
Daily puzzles, including the New York Times Crossword.
SUBSCRIBE TO UNLOCK MORE ARTICLES
Subscribe now to read the latest news in your city and across Canada.
Exclusive articles from Barbara Shecter, Joe O’Connor, Gabriel Friedman and others.
Daily content from Financial Times, the world’s leading global business publication.
Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
Daily puzzles, including the New York Times Crossword.
REGISTER / SIGN IN TO UNLOCK MORE ARTICLES
Create an account or sign in to continue with your reading experience.
Access articles from across Canada with one account.
Share your thoughts and join the conversation in the comments.
Enjoy additional articles per month.
Get email updates from your favourite authors.
Sign In or Create an Account
or
Article content
Remarkable new legislation introduced by President Milei to encourage large domestic and foreign investments in the country;
A US$4.4 Billion transaction led by BHP, the world’s largest mining company, and Lundin Mining to acquire two copper deposits located in the same province in Argentina as Los Azules;
At Los Azules, infill drilling during the 2023-24 season upgraded the resource categories, validated the geological model and confirmed the high-grade zone. Resource drilling for the Los Azules Feasibility Study is now complete, and the study remains on track for delivery in early 2025.
Remarkable and Welcoming Legislation – Milei Magic
President Milei’s government introduced legislation that has rolled out the welcome mat for large-scale domestic and foreign direct investments in Argentina.
This legislation recently approved by Argentina’s government is called “Bases and Starting Points for the Freedom of Argentines” and includes the Incentive Regime for Large Investors (RIGI), offering significant tax and foreign exchange incentives to encourage domestic and direct foreign investment in key sectors of the economy, including mining.
Advertisement 3
This advertisement has not loaded yet, but your article continues below.
Article content
This program addresses most of all past stumbling blocks for sustained development of the mining sector in Argentina, and it’s a huge step in the right direction.
We are excited about these changes as they open the door for many infrastructure investments in Argentina and significantly improve the economics of the Los Azules project and lower risks for investors. Details of the legislation are found in Appendix A – More Information on RIGI and you can click here for the official summary.
US$4.4 Billion Copper Transaction
Last week, BHP, the world’s largest mining company, and Lundin Mining announced a US$4.4 Billion transaction through which they have agreed to jointly acquire the two copper deposits Filo del Sol and Josemaria located in the same San Juan province of Argentina as Los Azules.
We believe that this transaction is a convincing demonstration of San Juan and Argentina´s attractiveness for large-scale mining projects and evidence of Argentina moving towards becoming a Tier 1 mining jurisdiction. Click on these links to read details of the transaction, in press releases by BHP, Lundin Mining, and Filo Corp.
Top Stories
Get the latest headlines, breaking news and columns.
By signing up you consent to receive the above newsletter from Postmedia Network Inc.
Thanks for signing up!
A welcome email is on its way. If you don’t see it, please check your junk folder.
The next issue of Top Stories will soon be in your inbox.
We encountered an issue signing you up. Please try again
Article content
Advertisement 4
This advertisement has not loaded yet, but your article continues below.
Article content
Los Azules Infill Drilling Highlights Confirming High Grade Copper Zone
At Los Azules, infill drilling upgraded the resource categories, validated the geological model and confirmed the high-grade zone. During the 2023-24 drilling season over 70,000 meters (m) were completed, that have strengthened the interpretation of the geological model in addition to extending the supergene enrichment zone mineralization, both at the edges and to depth.
Resource drilling for the Los Azules Feasibility Study is now complete, and the study remains on track for delivery in early 2025.
Drilling Highlights
Hole AZ24375, drilled to a depth of 369 m, returned 217 m of 1.11 % Cu in the enriched zone, including 100 m of 1.32 % Cu.
Hole AZ24335, drilled to a depth of 227.5 m, returned a 158 m intercept of 0.84% Cu within the enriched zone, including 78.5 m of 1.10 % Cu.
Hole AZ24403, drilled to a depth of 427 m, returned a 276 m intercept of 0.86% Cu within the enriched zone, including 160 m of 0.96 % Cu.
Hole AZ24320, drilled to a depth of 204 m, returned 146 m of 0.89% Cu in the enriched zone.
Hole AZ24332, drilled to a depth of 255.6 m, returned 119.6 m of 0.72% Cu in the enriched zone.
Advertisement 5
This advertisement has not loaded yet, but your article continues below.
Article content
The 2023-2024 drill campaign successfully achieved its objective of infilling existing drill hole data to support the conversion of resources to Measured or Indicated Mineral Resources to include in the Los Azules Feasibility Study. In addition, geotechnical, metallurgical, hydrogeological and condemnation drilling was carried out.
The locations of the highlighted results are presented in 8 figures. A plan or aerial view of the resources and the outline of the PEA pit are shown in Figure 1. Figures 2 to 7 show recent drilling in relation to the overburden, the leached, enriched and primary zones, and the 30-year pit shell of the 2023 Preliminary Economic Assessment (PEA) (marked by the green line in the sections). Figure 8 represents a cross section with recent drill data and inferred geology.
Drill results and location information for this press release are available in Appendix B – Detailed Data From the 2023-2024 Drilling Campaign at Los Azules. Figure 1 shows a plan view of the location of the sections and drill holes reported in this press release. All cross sections are 50 m equidistant from each other, with the lowest numbered section starting from the southern end of the deposit. Shown in blue are the collars of the drill holes included in this news release.
Advertisement 6
This advertisement has not loaded yet, but your article continues below.
Article content
Figure 1 – Plan View Location of Cross-sections and Drill Holes Reported in This News Release
The section marked on Figure 1 by the red dashed line is presented in Figure 2 as the longitudinal view looking northeast and indicating the location of the reported holes. Note the position of the highlighted holes within the zone of enriched (or supergene) mineralization and how they mostly ended in mineralized material, indicating the potential for mineralization to continue at depth. The length of the enriched zone on this section is 3.9 kilometers. The enriched zone now continues beyond the southern limit of the PEA mineable pit shell.
Figure 3 shows a 217 m intercept of 1.11 % Cu (AZ24375) and includes a 100 m interval of 1.32% Cu within the enriched zone. This hole infills a data gap within the center of the deposit and confirms the continuity of higher-grade mineralization.
Figure 3 – Section 45 – Drilling, Mineralized Zones and 30-Year PEA Pitshell (Looking Northwest)
Figure 4 shows an intercept of 276 m of 0.86 % Cu (AZ24403) that includes 160 m of 0.96% Cu in the enriched zone. This hole also infills a drilling gap in the center of the deposit with higher grade mineralization.
Advertisement 7
This advertisement has not loaded yet, but your article continues below.
Article content
Figure 4 – Section 43 – Drilling, Mineralized Zones and 30-Year PEA Pitshell (Looking Northwest)
Figure 5 shows a 146 m intercept of 0.89 % Cu (AZ24320). The drill hole extends high grade mineralization to the west of a previously drilled hole (AZ22152MET).
Figure 5 – Section 32 – Drilling, Mineralized Zones and 30-Year PEA Pitshell (Looking Northwest)
Figure 6 shows an intercept of 158 m of 0.84 % Cu (AZ24335) that includes 78.5 m of 1.10% Cu within the enriched zone. The drill hole ended in mineralized material, indicating the potential for mineralization to continue at depth within the enriched zone, as indicated by previously released drill holes.
Figure 6 – Section 31 – Drilling, Mineralized Zones and 30-Year PEA Pitshell (Looking Northwest)
Figure 7 shows a 119.6 m intercept of 0.72 % Cu (AZ24332) in the enriched zone. This hole extends the higher-grade mineralization seen previously in AZ23309 in the central portion of the enriched zone towards the east and at depth.
Figure 7 – Section 28 – Drilling, Mineralized Zones and 30-Year PEA Pitshell (Looking Northwest)
Advertisement 8
This advertisement has not loaded yet, but your article continues below.
Article content
Geological Model – Interpretation and Its Relationship with the Copper Mineralization
Geological understanding of the Los Azules deposit has increased significantly with the drilling performed from 2022 to 2024. A series of copper-bearing early and inter-mineral porphyry dikes and hydrothermal magmatic breccias are cutting across a pre-mineral diorite intrusive. The dikes dip steeply to the east in their northwest-southeast orientations.
All rock types contain variable copper mineralization, depending on their position within the deposit’s vertical profile. From top to bottom, the zoning includes leached, supergene (enriched) and primary (hypogene), which are characteristic of many porphyry copper deposits worldwide.
Hypogene mineralization, associated with the early mineral porphyry and proximal host rock, is characterized by a stockwork of abundant type A veinlets containing quartz, pyrite, and chalcopyrite. In much of the deposit’s footprint, mineralization encountered at depth strongly indicates the potential to extend further, beyond 1,000 meters.
Advertisement 9
This advertisement has not loaded yet, but your article continues below.
Article content
The supergene copper enrichment process created higher grades in the early mineral porphyry and associated hydrothermal magmatic breccias, and lower grades in the less permeable pre-mineral pluton and inter-mineral porphyries. The supergene mineralization will be the principal mineral feed for the leach pad for the Feasibility Study.
In Figure 8 Section 29 shows, in its central part, the early mineral porphyry (purple color) intruding or cutting the pre-mineral diorite (light green color). To a lesser extent, thin inter-mineral porphyry dikes (light blue color), affect both the early mineral porphyry and the pre-mineral diorite. The early mineral porphyry is the primary source of copper mineralization in the deposit.
Figure 8 – Recent Drill Data and Inferred Geology in Cross Section 29
Technical Information
The technical content of this press release has been reviewed and approved by Darren King, Director of Exploration of McEwen Copper, who serves as the qualified person (QP) under the definitions of National Instrument 43-101.
All tasks, including the collection of samples for geochemical analysis, were carried out in accordance with generally accepted mining industry standards. Drill core samples were analyzed by Alex Stewart International laboratory, located in the Province of Mendoza, Argentina, whose assays consisted of: gold analysis by fire fusion assay and an atomic absorption spectroscopy finish (Au4-30); multiple element studies by ICP-OES analysis (ICP-AR 39); determination of copper content by sequential copper analysis (Cu-Sequential LMC-140). In addition, and for samples with high sulfide content (Cu, Ag, Pb and Zn) and exceeding the limits of analysis, an ICP-ORE type analysis was performed.
Advertisement 10
This advertisement has not loaded yet, but your article continues below.
Article content
The company is conducting a quality control/assurance program in accordance with NI 43-101, and industry best practices, using a combination of standards and blanks on approximately one out of every 25 samples. Results are monitored as final certificates are received and any re-assay requests are sent immediately. Analysis of pulp and preparation samples is also performed as part of the quality control process. Approximately 5% of the sample pulps are sent to a secondary laboratory for control purposes. In addition, the laboratory performs its own internal quality control checks, and the results are made available on certificates for company review.
ABOUT MCEWEN COPPER
McEwen Copper is a well-funded, private company that owns 100% of the large, advanced-stage Los Azules copper project, located in the San Juan province, Argentina. McEwen Copper is a 48.3%-owned private subsidiary of McEwen Mining, which trades under the ticker MUX on NYSE and TSX.
Los Azules is being designed to be distinctly different from a conventional copper mine by consuming significantly less water, emitting much lower carbon, progressing towards carbon neutral by 2038, and being powered by 100% renewable electricity once in operation. The updated Preliminary Economic Assessment (PEA) released in June 2023 projects a long life of mine, short payback period, low production cost per pound, high annual copper production, and a 21.2% after-tax IRR.
Advertisement 11
This advertisement has not loaded yet, but your article continues below.
Article content
ABOUT MCEWEN MINING
McEwen Mining is a gold and silver producer with operations in Nevada, Canada, Mexico, and Argentina. McEwen Mining also owns a 48.3% interest in McEwen Copper, which is developing the large, advanced-stage Los Azules copper project in Argentina. The Company’s objective is to improve the productivity and life of its assets with the goal of increasing the share price and providing investor yield. Rob McEwen, Chairman and Chief Owner, has a personal investment in the companies of US$225 million. His annual salary is US$1.
Appendix A – More Information on RIGI –
The RIGI grants a series of benefits in tax, customs and foreign exchange regulations for investment projects in the mining sector that comply with the requirements set up by the law.
The main requirements for beneficiaries of RIGI are as follows:
The amount for an investment to qualify within the regime will be >US$200 million, as determined for different industries by the regulations.
Export projects with investments greater than US$1 billion are considered strategic and have additional benefits.
At least 40% of the minimum amount must be invested in the first two years.
The regime will be open to applications for 2 years. The application period can be extended for 1 more year. The investment can be completed after the application period.
The use of incentives may require collateral.
Advertisement 12
This advertisement has not loaded yet, but your article continues below.
Article content
The Los Azules project is believed to be able to meet all criteria to be considered a strategic project under the terms of the RIGI legislation.
The main benefits to the beneficiaries of the RIGI are the following:
1. Income Tax
Corporate income tax rate is reduced from the current 35% to 25%.
Equipment is subject to accelerated depreciation in 2 years, and infrastructure and cost of mine in 60% of its useful life.
Net Operating Losses (NOLs) can be carried forward without a time limit. After a 5-year carry forward, NOLs can be transferred (sold) to third parties. NOLs are adjusted for inflation.
Interest is deductible without limitations during the first 5 years even when the lender is foreign related party.
Dividend payments are subject to tax at 7%, which will be reduced to 3.5% after 7 years.
In the case of Strategic Export projects, payments to foreign beneficiaries for technical assistance are not subject to withholding tax. Other payments to foreign beneficiaries are capped at 10.5% withholding with no grossing up.
2. Value Added Tax (VAT)
Rather than paying VAT on purchases, the beneficiaries of the RIGI will provide its suppliers with Tax Credit Certificates. The Tax Credit Certificates can also be used to pay the VAT generated by imports of equipment. This prevents from tying up funds as VAT credits to be recovered against future exports. Implementation of this benefit will require extensive regulation.
Suppliers may use the certificates to offset their VAT obligations and, if there is a VAT credit left to recover, they may transfer (sell) the VAT credit to third parties.
Advertisement 13
This advertisement has not loaded yet, but your article continues below.
Article content
3. Other Taxes
The beneficiaries of the regimen will have a 100% tax credit for the amounts paid for Bank Transactions Tax to offset the income tax obligations.
Provinces and Municipalities cannot establish new taxes affecting the projects, except for service fees that do not exceed the cost of the service provided to the beneficiary.
4. Imports
Freedom to import without quotas or restrictions.
Exemption from import duties on capital goods, spare parts, parts, components and consumables.
5. Exports
Freedom to export the products produced by the project.
Exemption from export duties after three years of registration. The exemption applies for two years in Strategic Export projects.
Maximum Principal gross revenue royalty of 5% (at the discretion of the Province).
6. Foreign Exchange Regime
Foreign proceeds from exports are freely available: 20% of proceeds after two years of the commencement of production; 40% after three years, and 100% after four years onwards.
In the case of a Strategic Export project, the foreign proceeds are freely available as follows: 20% of proceeds after one year of the commencement of production; 40% after two years, and 100% after three years onwards.
Foreign proceeds from external financing are freely available. Foreign assets abroad do not generate foreign exchange restrictions.
Free access to the foreign exchange market for the repayment of loans, repatriation of investments, payment of interests and dividends, conditional on the investment or loan having been entered through the exchange market.
Advertisement 14
This advertisement has not loaded yet, but your article continues below.
Article content
7. Stability Safeguards
Beneficiaries are also granted tax, customs and foreign exchange stability for 30 years from joining the RIGI. In the case of Strategic Export projects developed in stages, stability can be extended up to 40 years from the commencement of production of the first stage.
The safeguards offered by the stability have these main features:
Tax stability applies by tax and not by total tax burden. It also applies to withholding taxes on payments to foreign beneficiaries. In the event of an increase in taxes, the beneficiaries of the regimen may reject the payment of the tax exceeding stability or pay the tax and use the amount of the tax paid as a tax credit against any other national tax. A breach of stability is presumed (it is not necessary to prove it) if it comes from a legal or regulatory change. In the case of tax reduction, the beneficiaries can automatically take advantage of it.
Customs stability includes a mechanism that allows the beneficiaries to make a manual self-assessment applying the stabilized duties instead of the automatic calculation by the customs system.
Foreign exchange stability protects against regulations imposing more burdensome or restrictive conditions. The law allows beneficiaries to reject the application of the new rule. The Central Bank cannot initiate criminal proceedings without first carrying out a process to determine whether the exchange stability applies to the case.
Advertisement 15
This advertisement has not loaded yet, but your article continues below.
Article content
Dispute Resolution
Disputes can be resolved by administrative proceedings or international arbitration outside Argentina. Arbitration can be initiated, even if the administrative procedure has not been completed.
The arbitration is to be done outside of Argentina, under the rules of the PCA, ICC or ICSID, with arbitrators who are neither Argentine nor nationals of the investor’s country.
Appendix B – Detailed Data From the 2023-2024 Drilling Campaign at Los Azules –
Table 1 – Recent Los Azules Drilling Results
Hole-ID
Section
Predominant Mineral Zone
From (m)
To (m)
Length (m)
Cu (%)
Au (g/t)
Ag (g/t)
Comment
AZ24316
26
Total
111.0
315.5
204.5
0.63
0.05
1.23
Enriched
111.0
293.0
182.0
0.64
0.05
1.22
Incl. 123 m of 0.8% Cu
Primary
293.0
315.5
22.5
0.26
0.00
1.70
AZ24317
56
Total
107.0
305.0
198.0
0.18
0.03
0.61
Enriched
107.0
305.0
198.0
0.18
0.03
0.61
Primary
AZ24318MET
50
Total
124.0
229.5
105.5
0.70
0.05
2.53
Enriched
124.0
229.5
105.5
0.70
0.05
2.53
Incl. 12 m of 1.44% Cu
Primary
AZ24319
35
Total
160.0
355.0
195.0
0.45
0.04
0.96
Enriched
160.0
332.0
172.0
0.48
0.04
1.04
Incl. 84 m of 0.51% Cu
Primary
332.0
355.0
23.0
0.27
0.03
0.36
AZ24320
32
Total
58.0
204.0
146.0
0.89
0.05
1.67
Enriched
58.0
204.0
146.0
0.89
0.05
1.67
Primary
AZ24321
30
Total
117.0
389.8
272.8
0.60
0.05
1.32
Enriched
117.0
389.8
272.8
0.60
0.05
1.32
Incl. 12 m of 0.85% Cu
Primary
AZ24322
44
Total
144.0
491.0
347.0
0.43
0.06
1.78
Enriched
144.0
491.0
347.0
0.43
0.06
1.78
Incl. 130 m of 0.57% Cu
Primary
AZ24323
26
Total
86.0
184.6
98.6
0.19
0.01
0.64
Enriched
86.0
184.6
98.6
0.19
0.01
0.64
Primary
AZ24324
34
Total
108.0
343.0
235.0
0.37
0.02
0.36
Enriched
108.0
322.0
214.0
0.40
0.02
0.37
Incl. 12 m of 0.92% Cu
Primary
322.0
343.0
21.0
0.12
0.02
0.30
AZ24325
25
Total
76.0
338.0
262.0
0.19
0.02
0.65
Enriched
76.0
266.0
190.0
0.21
0.02
0.65
Primary
266.0
338.0
72.0
0.14
0.02
0.64
AZ24326
26
Total
108.0
331.0
223.0
0.42
0.05
1.30
Enriched
108.0
256.0
148.0
0.52
0.07
1.47
Incl. 57.7 m of 0.59% Cu
Primary
256.0
331.0
75.0
0.23
0.03
0.95
AZ24327
31
Total
78.0
316.0
238.0
0.38
0.03
1.10
Enriched
78.0
316.0
238.0
0.38
0.03
1.10
Primary
AZ24328
48
Total
126.0
231.0
105.0
0.08
0.02
1.13
Enriched
126.0
231.0
105.0
0.08
0.02
1.13
Primary
AZ24329
29
Total
90.0
332.0
242.0
0.24
0.03
0.89
Enriched
90.0
290.0
200.0
0.25
0.03
0.96
Primary
290.0
332.0
42.0
0.17
0.02
0.56
AZ24330
56
Total
164.0
185.0
21.0
0.70
0.03
1.26
Enriched
164.0
185.0
21.0
0.70
0.03
1.26
Primary
AZ24332
28
Total
136.0
255.6
119.6
0.72
0.06
1.72
Enriched
136.0
255.6
119.6
0.72
0.06
1.72
Primary
AZ24334
48
Total
104.0
657.0
553.0
0.42
0.07
2.94
Enriched
104.0
412.0
308.0
0.50
0.08
3.53
Incl. 60 m of 0.71% Cu
Primary
412.0
657.0
245.0
0.32
0.06
2.21
AZ24335
31
Total
69.5
227.5
158.0
0.84
0.10
0.98
Enriched
69.5
227.5
158.0
0.84
0.10
0.98
Incl. 78.5 m of 1.10% Cu
Primary
AZ24336CC
8a
Total
218.0
501.0
283.0
0.20
0.08
1.93
Enriched
218.0
370.0
152.0
0.25
0.14
2.76
Primary
370.0
501.0
131.0
0.14
0.02
0.91
AZ24338
5a
Total
252.0
729.5
477.5
0.19
0.02
0.88
Enriched
252.0
490.0
238.0
0.23
0.04
0.97
Primary
490.0
729.5
239.5
0.14
0.01
0.78
AZ24339CC
12a
Total
140.0
517.5
377.5
0.16
0.02
0.68
Enriched
140.0
470.0
330.0
0.17
0.02
0.67
Primary
470.0
517.5
47.5
0.11
0.01
0.74
AZ24340
26
Total
66.0
300.5
234.5
0.50
0.04
1.04
Enriched
66.0
300.5
234.5
0.50
0.04
1.04
Incl. 72 m of 0.78% Cu
Primary
AZ24341
48
Total
87.0
261.5
174.5
0.57
0.07
1.09
Enriched
87.0
261.5
174.5
0.57
0.07
1.09
Primary
AZ24342
28
Total
81.0
235.5
154.5
0.39
0.05
2.82
Enriched
81.0
235.5
154.5
0.39
0.05
2.82
Primary
AZ24343
58
Total
71.0
365.6
294.6
0.17
0.01
0.67
Enriched
71.0
344.0
273.0
0.18
0.01
0.70
Primary
344.0
365.6
21.6
0.07
0.00
0.30
AZ24344
43
Total
140.0
312.0
172.0
0.43
0.05
1.50
Enriched
140.0
312.0
172.0
0.43
0.05
1.50
Incl. 52 m of 0.62% Cu
Primary
AZ24345
44
Total
80.7
291.2
210.5
0.37
0.02
1.98
Enriched
80.7
190.0
109.3
0.55
0.02
1.68
Incl. 66 m of 0.66% Cu
Primary
190.0
291.2
101.2
0.17
0.02
2.31
AZ24346
40
Total
44.0
196.6
152.6
0.06
0.00
0.64
Enriched
44.0
100.0
56.0
0.07
0.00
0.33
Primary
100.0
196.6
96.6
0.06
0.00
0.83
AZ24347
14
Total
88.0
295.8
207.8
0.30
0.05
0.90
Enriched
88.0
286.0
198.0
0.30
0.05
0.94
Primary
286.0
295.8
9.8
0.15
0.06
0.30
AZ24348
40
Total
168.0
373.7
205.7
0.20
0.01
0.56
Enriched
168.0
373.7
205.7
0.20
0.01
0.56
Primary
AZ24349
22
Total
98.0
356.0
258.0
0.44
0.04
1.27
Enriched
98.0
339.4
241.4
0.46
0.04
1.31
Incl. 84 m of 0.78% Cu
Primary
339.4
356.0
16.6
0.20
0.03
0.63
AZ24350
30
Total
96.0
224.0
128.0
0.10
0.02
1.01
Enriched
96.0
154.0
58.0
0.12
0.03
1.21
Primary
154.0
224.0
70.0
0.08
0.02
0.85
AZ24351A
29
Total
110.0
449.4
339.4
0.29
0.03
1.52
Enriched
110.0
400.0
290.0
0.31
0.03
1.69
Primary
400.0
449.4
49.4
0.12
0.01
0.51
AZ24352
12
Total
168.3
379.3
211.0
0.34
0.05
0.67
Enriched
168.3
358.0
189.7
0.36
0.05
0.56
Primary
358.0
379.3
21.3
0.13
0.03
1.62
AZ24353
46
Total
90.0
338.5
248.5
0.35
0.04
1.85
Enriched
90.0
320.0
230.0
0.37
0.04
1.96
Primary
320.0
338.5
18.5
0.12
0.00
0.52
AZ24354
42
Total
194.0
331.0
137.0
0.14
0.01
0.71
Enriched
194.0
331.0
137.0
0.14
0.01
0.71
Primary
AZ24355
56
Total
84.5
288.5
204.0
0.23
0.01
0.87
Enriched
84.5
288.5
204.0
0.23
0.01
0.87
Primary
AZ24356
56
Total
51.0
205.5
154.5
0.70
0.15
3.79
Enriched
51.0
108.0
57.0
0.17
0.04
1.43
Primary
108.0
205.5
97.5
1.01
0.21
5.14
Incl. 30 m of 2.84% Cu
AZ24357
22
Total
152.0
386.0
234.0
0.21
0.02
2.51
Enriched
152.0
302.0
150.0
0.24
0.02
0.45
Primary
302.0
386.0
84.0
0.17
0.02
6.18
AZ24358
36
Total
70.2
264.5
194.3
0.23
0.01
0.57
Enriched
70.2
188.0
117.8
0.18
0.01
0.53
Primary
188.0
264.5
76.5
0.31
0.00
0.62
AZ24360
24
Total
84.0
335.5
251.5
0.21
0.02
0.89
Enriched
84.0
258.0
174.0
0.25
0.02
0.87
Primary
258.0
335.5
77.5
0.12
0.02
0.93
AZ24361
12
Total
220.0
335.2
115.2
0.42
0.06
1.37
Enriched
220.0
308.0
88.0
0.49
0.07
1.35
Incl. 28 m of 0.68% Cu
Primary
308.0
335.2
27.2
0.17
0.03
1.45
AZ24362
34
Total
76.0
309.0
233.0
0.34
0.01
1.01
Enriched
76.0
309.0
233.0
0.34
0.01
1.01
Primary
AZ24363
48
Total
96.0
335.6
239.6
0.18
0.01
0.71
Enriched
96.0
250.0
154.0
0.20
0.00
0.57
Primary
250.0
335.6
85.6
0.14
0.01
0.96
AZ24364
51
Total
92.0
215.4
123.4
0.21
0.03
0.82
Enriched
92.0
215.4
123.4
0.21
0.03
0.82
Primary
AZ24365
55
Total
118.0
291.5
173.5
0.40
0.01
1.32
Enriched
118.0
291.5
173.5
0.40
0.01
1.32
Incl. 10 m of 0.89% Cu
Primary
AZ24366
22
Total
182.0
328.2
146.2
0.17
0.02
0.78
Enriched
182.0
298.0
116.0
0.19
0.02
0.91
Primary
298.0
328.2
30.2
0.10
0.01
0.25
AZ24367
50
Total
94.0
433.5
339.5
0.32
0.05
1.30
Enriched
94.0
400.0
306.0
0.32
0.06
1.30
Primary
400.0
433.5
33.5
0.26
0.04
1.34
AZ24368
4
Total
138.0
220.5
82.5
0.21
0.03
0.52
Enriched
138.0
220.5
82.5
0.21
0.03
0.52
Primary
AZ24369A
48
Total
122.0
248.0
126.0
0.61
0.05
1.14
Enriched
122.0
248.0
126.0
0.61
0.05
1.14
Incl. 58 m of 1.01% Cu
Primary
AZ24370
8
Total
156.0
290.0
134.0
0.39
0.04
0.53
Enriched
156.0
262.0
106.0
0.44
0.05
0.60
Incl. 20 m of 0.81% Cu
Primary
262.0
290.0
28.0
0.22
0.04
0.25
AZ24371
36
Total
98.0
302.1
204.1
0.31
0.03
0.74
Enriched
98.0
290.0
192.0
0.32
0.03
0.77
Primary
290.0
302.1
12.1
0.16
0.00
0.25
AZ24372
10
Total
155.7
298.2
142.5
0.38
0.06
0.99
Enriched
155.7
298.2
142.5
0.38
0.06
0.99
Primary
AZ24373
54
Total
120.0
291.5
171.5
0.22
0.00
0.71
Enriched
120.0
264.0
144.0
0.23
0.00
0.75
Primary
264.0
291.5
27.5
0.13
0.00
0.53
AZ24374
52
Total
91.3
340.6
249.3
0.35
0.01
0.54
Enriched
91.3
340.6
249.3
0.35
0.01
0.54
Primary
AZ24375
45
Total
152.0
369.0
217.0
1.11
0.07
3.65
Enriched
152.0
369.0
217.0
1.11
0.07
3.65
Incl. 100 m of 1.32% Cu
Primary
AZ24376
4
Total
158.0
261.9
103.9
0.21
0.05
1.13
Enriched
158.0
193.0
35.0
0.28
0.02
0.69
Primary
193.0
261.9
68.9
0.18
0.06
1.35
AZ24377
9
Total
148.0
297.5
149.5
0.40
0.04
0.89
Enriched
148.0
291.4
143.4
0.41
0.04
0.88
Incl. 40 m of 0.62% Cu
Primary
291.4
297.5
6.2
0.20
0.04
0.92
AZ24378
29
Total
174.0
454.0
280.0
0.38
0.05
1.31
Enriched
174.0
314.0
140.0
0.41
0.05
1.19
Primary
314.0
454.0
140.0
0.34
0.06
1.43
AZ24379
24
Total
114.0
365.8
251.8
0.22
0.02
0.89
Enriched
114.0
365.8
251.8
0.22
0.02
0.89
Primary
AZ24380
5
Total
60.0
287.5
227.5
0.16
0.01
0.62
Enriched
60.0
256.0
196.0
0.17
0.01
0.63
Primary
256.0
287.5
31.5
0.12
0.00
0.58
AZ24381
18
Total
234.0
375.1
141.1
0.16
0.02
0.90
Enriched
234.0
292.0
58.0
0.22
0.02
0.90
Primary
292.0
375.1
83.1
0.12
0.02
0.90
AZ24382
20
Total
194.0
385.0
191.0
0.13
0.02
0.60
Enriched
194.0
329.0
135.0
0.15
0.02
0.70
Primary
329.0
385.0
56.0
0.10
0.01
0.37
AZ24383
50
Total
74.2
371.7
297.5
0.38
0.01
8.00
Enriched
74.2
356.0
281.8
0.39
0.01
8.39
Primary
356.0
371.7
15.7
0.18
0.01
0.86
AZ24384
18
Total
202.3
270.0
67.7
0.16
0.01
0.29
Enriched
202.3
270.0
67.7
0.16
0.01
0.29
Primary
AZ24385
38
Total
84.0
250.4
166.4
0.21
0.00
0.44
Enriched
84.0
216.0
132.0
0.21
0.00
0.46
Primary
216.0
250.4
34.4
0.19
0.01
0.33
AZ24386
1a
Total
228.0
380.3
152.3
0.21
0.06
1.07
Enriched
228.0
378.0
150.0
0.21
0.06
1.06
Primary
378.0
380.3
2.3
0.22
0.02
1.50
AZ24387
52
Total
62.0
452.0
390.0
0.46
0.07
2.27
Enriched
62.0
106.0
44.0
0.69
0.10
2.72
Incl. 44 m of 0.69% Cu
Primary
106.0
202.0
96.0
0.43
0.06
2.33
Incl. 132 m of 0.51% Cu
AZ24388
6
Total
170.0
245.3
75.3
0.21
0.10
1.22
Enriched
170.0
221.7
51.7
0.22
0.10
0.99
Primary
221.7
245.3
23.6
0.20
0.11
1.77
AZ24389
28
Total
176.0
343.3
167.3
0.16
0.01
0.52
Enriched
176.0
343.3
167.3
0.16
0.01
0.52
Primary
AZ24390
24
Total
194.0
338.8
144.8
0.15
0.01
0.38
Enriched
194.0
338.8
144.8
0.15
0.01
0.38
Primary
AZ24391
45
Total
133.0
331.0
198.0
0.84
0.09
2.32
Enriched
133.0
331.0
198.0
0.84
0.09
2.32
Incl. 129 m of 1.16% Cu
Primary
AZ24392A
54
Total
100.0
324.0
224.0
0.15
0.01
0.68
Enriched
100.0
306.0
206.0
0.16
0.01
0.71
Primary
306.0
324.0
18.0
0.13
0.00
0.27
AZ24393
16
Total
186.0
264.7
78.7
0.08
0.02
0.42
Enriched
186.0
264.7
78.7
0.08
0.02
0.42
Primary
AZ24394
28
Total
69.0
242.3
173.3
0.20
0.02
1.65
Enriched
69.0
144.0
75.0
0.14
0.01
0.46
Primary
144.0
242.3
98.3
0.24
0.03
2.55
AZ24395A
20
Total
168.0
407.0
239.0
0.16
0.01
0.45
Enriched
168.0
407.0
239.0
0.16
0.01
0.45
Primary
AZ24396
49
Total
81.0
497.0
416.0
0.37
0.13
2.40
Enriched
81.0
440.0
359.0
0.39
0.15
2.50
Primary
440.0
497.0
57.0
0.25
0.05
1.76
AZ24397
16
Total
198.0
412.4
214.4
0.25
0.05
1.11
Enriched
198.0
322.0
124.0
0.34
0.07
1.39
Primary
322.0
412.4
90.4
0.13
0.02
0.72
AZ24398
3a
Total
194.0
408.8
214.8
0.23
0.04
45.73
Enriched
194.0
408.8
214.8
0.23
0.04
45.73
Primary
AZ24399
16
Total
172.0
367.9
195.9
0.55
0.07
0.96
Enriched
172.0
367.9
195.9
0.55
0.07
0.96
Incl. 104 m of 0.65% Cu
Primary
AZ24400
26
Total
176.0
227.0
51.0
0.36
0.01
2.33
Enriched
176.0
227.0
51.0
0.36
0.01
2.33
Primary
AZ24401
32
Total
78.0
324.5
246.5
0.24
0.00
0.62
Enriched
78.0
324.5
246.5
0.24
0.00
0.62
Primary
AZ24402
20
Total
66.0
230.0
164.0
0.24
0.01
0.56
Enriched
66.0
166.0
100.0
0.29
0.01
0.64
Primary
166.0
230.0
64.0
0.17
0.01
0.44
AZ24403
43
Total
151.0
427.0
276.0
0.86
0.06
2.32
Enriched
151.0
427.0
276.0
0.86
0.06
2.32
Incl. 160.0 m of 0.96% Cu
Primary
AZ24404
29
Total
66.7
73.5
6.9
0.19
0.02
0.58
Enriched
66.7
72.0
5.4
0.18
0.01
0.25
Primary
72.0
73.5
1.5
0.23
0.04
1.80
AZ24404A
29
Total
87.0
133.0
46.0
0.14
0.01
2.18
Enriched
Primary
87.0
133.0
46.0
0.14
0.01
2.18
AZ24404B
29
Total
133.0
187.5
54.5
0.22
0.01
0.56
Enriched
Primary
133.0
187.5
54.5
0.22
0.01
0.56
AZ24405
14
Total
246.0
317.6
71.6
0.15
0.03
0.65
Enriched
246.0
314.0
68.0
0.15
0.03
0.65
Primary
314.0
317.6
3.6
0.16
0.02
0.61
AZ24406
55
Total
84.0
324.2
240.2
0.10
0.03
0.78
Enriched
84.0
230.0
146.0
0.14
0.02
0.79
Primary
230.0
324.2
94.2
0.05
0.04
0.77
AZ24407
12
Total
186.0
259.0
73.0
0.09
0.03
0.42
Enriched
186.0
259.0
73.0
0.09
0.03
0.42
Primary
AZ24408
32
Total
80.0
313.5
233.5
0.25
0.01
0.67
Enriched
80.0
313.5
233.5
0.25
0.01
0.67
Primary
AZ24409
54
Total
102.0
270.0
168.0
0.23
0.01
0.90
Enriched
102.0
270.0
168.0
0.23
0.01
0.90
Primary
AZ24410
6
Total
186.0
241.0
55.0
0.19
0.02
0.43
Enriched
186.0
241.0
55.0
0.19
0.02
0.43
Primary
AZ24411
14
Total
180.0
334.0
154.0
0.19
0.06
0.80
Enriched
180.0
232.0
52.0
0.31
0.08
0.70
Primary
232.0
334.0
102.0
0.13
0.05
0.86
AZ24412
12
Total
180.2
297.5
117.3
0.20
0.04
0.96
Enriched
180.2
272.0
91.8
0.22
0.04
0.99
Primary
272.0
297.5
25.5
0.13
0.04
0.85
AZ24413
38
Total
136.0
317.0
181.0
0.19
0.01
0.64
Enriched
136.0
317.0
181.0
0.19
0.01
0.64
Primary
AZ24414
47
Total
110.0
415.6
305.6
0.55
0.06
2.25
Enriched
110.0
415.6
305.6
0.55
0.06
2.25
Incl. 104.5 m of 0.73% Cu
Primary
AZ24415
56
Total
108.0
346.0
238.0
0.15
0.04
0.74
Enriched
108.0
322.0
214.0
0.15
0.04
0.74
Primary
322.0
346.0
24.0
0.12
0.05
0.73
AZ24417
12
Total
126.0
253.7
127.7
0.32
0.04
0.90
Enriched
126.0
253.7
127.7
0.32
0.04
0.90
Primary
AZ24418
16
Total
141.0
329.0
188.0
0.57
0.09
0.70
Enriched
141.0
284.0
143.0
0.63
0.09
0.77
Incl. 64 m of 0.66% Cu
Primary
284.0
329.0
45.0
0.41
0.11
0.48
Incl. 7 m of 0.58% Cu
AZ24419
6
Total
182.0
248.0
66.0
0.15
0.04
1.16
Enriched
182.0
204.0
22.0
0.27
0.03
0.77
Primary
204.0
248.0
44.0
0.09
0.05
1.35
AZ24421
44
Total
100.0
229.0
129.0
0.64
0.06
1.71
Enriched
100.0
229.0
129.0
0.64
0.06
1.71
Incl. 72 m of 0.85% Cu
Primary
AZ24422
42
Total
184.0
236.2
52.2
1.31
0.11
2.16
Enriched
184.0
236.2
52.2
1.31
0.11
2.16
Primary
GTK2424
15
Total
106.0
152.8
46.8
0.44
0.05
3.62
Enriched
106.0
152.8
46.8
0.44
0.05
3.62
Incl. 29.0 m of 0.60% Cu
Primary
GTK2424B
15
Total
152.8
272.9
120.2
0.69
0.03
1.30
Enriched
152.8
155.0
2.3
0.28
0.06
6.50
Primary
155.0
272.9
117.9
0.70
0.03
1.18
GTK2425
15
Total
150.0
300.0
150.0
0.21
0.05
1.00
Enriched
150.0
300.0
150.0
0.21
0.05
1.00
Primary
GTK2426
43
Total
70.0
400.0
330.0
0.62
0.09
1.99
Enriched
70.0
400.0
330.0
0.62
0.09
1.99
Incl. 150 m of 0.86% Cu
Primary
GTK2427
25
Total
160.0
250.0
90.0
0.14
0.00
0.37
Enriched
160.0
250.0
90.0
0.14
0.00
0.37
Primary
GTK2430
25
Total
121.5
125.0
3.5
0.08
0.00
0.25
Enriched
121.5
125.0
3.5
0.08
0.00
0.25
Primary
GTK2430A
25
Total
98.0
300.0
202.0
0.19
0.02
1.13
Enriched
98.0
300.0
202.0
0.19
0.02
1.13
Primary
GTK2431
49
Total
72.0
400.0
328.0
0.35
0.03
1.48
Enriched
72.0
400.0
328.0
0.35
0.03
1.48
Primary
GTK2432
8
Total
236.0
350.0
114.0
0.30
0.05
0.99
Enriched
236.0
350.0
114.0
0.30
0.05
0.99
Primary
OBS-MW-1
56
Total
42.0
519.0
477.0
0.08
0.04
0.50
Enriched
42.0
198.0
156.0
0.15
0.08
0.75
Primary
198.0
519.0
321.0
0.05
0.01
0.38
OBS-MW-2
45
Total
58.0
401.0
343.0
0.55
0.07
1.72
Enriched
58.0
401.0
343.0
0.55
0.07
1.72
Incl. 124 m of 0.80% Cu
Primary
OBS-MW-3
13
Total
196.0
332.0
136.0
0.55
0.06
1.28
Enriched
196.0
318.0
122.0
0.58
0.06
1.38
Incl. 116 m of 0.60% Cu
Primary
318.0
332.0
14.0
0.22
0.06
0.25
OBS-MW-3A
13
Total
331.5
542.0
210.5
0.28
0.03
0.53
Enriched
Primary
331.5
542.0
210.5
0.28
0.03
0.53
OBS-MW-4
43
Total
72.0
404.0
332.0
0.30
0.02
1.31
Enriched
72.0
228.0
156.0
0.34
0.03
1.60
Primary
228.0
404.0
176.0
0.26
0.01
1.06
Advertisement 16
This advertisement has not loaded yet, but your article continues below.
Article content
Table 2 – Locations and Lengths of Recent Los Azules Drilling Results
HOLE-ID
Azimuth
Dip
Length
Loc X
Loc Y
Loc Z
AZ24316
250
-73
315.5
2383435.1
6558678.2
3666.7
AZ24317
70
-69
305.0
2383122
6560160.6
3674.5
AZ24318MET
90
-36
229.5
2382779.4
6559715.5
3599.8
AZ24319
70
-74
355.0
2383196.1
6559064.4
3662.8
AZ24320
270
-74
204.0
2383392.9
6558995.4
3643.8
AZ24321
250
-71
389.8
2383587.5
6558949.7
3658.1
AZ24322
250
-74
491.0
2383529.3
6559670.4
3678.8
AZ24323
250
-75
184.6
2382815.5
6558454.5
3745.7
AZ24324
70
-74
343.0
2383177
6559013.5
3655.6
AZ24325
70
-75
338.0
2383203
6558546.2
3674.4
AZ24326
70
-75
331.0
2383435
6558675.4
3666.9
AZ24327
250
-73
316.0
2383306.1
6558900.8
3659
AZ24328
68
-78
231.0
2383354.5
6559819.4
3629.4
AZ24329
250
-76
332.0
2383267.6
6558804.7
3662.4
AZ24330
263
-70
185.0
2383121.7
6560157.4
3674.5
AZ24332
70
-70
255.6
2383385.1
6558761.7
3663.1
AZ24333
301
-52
194.8
2383371.7
6559955.7
3634.3
AZ24334
250
-80
657.0
2383092.1
6559726.7
3614.6
AZ24335
70
-78
227.5
2383420.4
6558945.8
3646
AZ24336CC
250
-75
501.0
2383790.1
6557046.2
3823
AZ24338
250
-70
729.5
2384000
6557297.5
3883.3
AZ24339CC
250
-75
517.5
2383757.2
6556832.1
3814.6
AZ24340
70
-75
300.5
2383315.6
6558678
3668.4
AZ24341
250
-70
261.5
2383352
6559818.5
3629.4
AZ24342
70
-77
235.5
2383292.3
6558738.8
3661.9
AZ24343
185
-66
365.6
2382578.4
6560067
3586.9
AZ24344
250
-72
312.0
2383467.1
6559604.4
3666.3
AZ24345
250
-71
291.2
2382849.6
6559429.1
3630
AZ24346
249
-67
196.6
2382734.1
6559174.8
3658.4
AZ24347
250
-75
295.8
2383765.6
6558161.7
3713.7
AZ24348
70
-76
373.7
2383529.3
6559460.5
3689.2
AZ24349
250
-71
356.0
2383437.7
6558468.5
3700.7
AZ24350
243
-68
224.0
2382747.6
6558657.2
3744.2
AZ24351A
70
-73
449.4
2383570.2
6558891.6
3657
AZ24352
250
-76
379.3
2383637.7
6558013.6
3763
AZ24353
250
-71
338.5
2382747.2
6559491.2
3634.9
AZ24354
70
-72
331.0
2383492
6559556
3675.8
AZ24355
198
-69
288.5
2382702.8
6560022.5
3591
AZ24356
119
-63
205.5
2383473.6
6560288.5
3635.9
AZ24357
250
-74
386.0
2383719.2
6558572.6
3692.8
AZ24358
250
-74
264.5
2382963.9
6559038.7
3656.4
AZ24360
242
-81
335.5
2383323.4
6558544.4
3672.3
AZ24361
70
-67
335.2
2383633.7
6558012.4
3762.8
AZ24362
70
-77
309.0
2382967.6
6558938
3658
AZ24363
250
-68
335.6
2382600.9
6559549.9
3631.6
AZ24364
305
-63
215.4
2383473.5
6560004.4
3632.3
AZ24365
209
-65
291.5
2382823.8
6559998.4
3596.3
AZ24366
70
-74
328.2
2383719.2
6558572.5
3692.9
AZ24367
150
-70
433.5
2383369.4
6559934.6
3632.3
AZ24368
70
-70
220.5
2383843.8
6557666.9
3759.5
AZ24369A
15
-35
248.0
2382815.2
6559609.1
3611.2
AZ24370
70
-73
290.0
2383762.9
6557847.5
3751
AZ24371
70
-80
302.1
2382963.7
6559039.3
3656.6
AZ24372
70
-72
298.2
2383721.7
6557926.1
3743.3
AZ24373
70
-75
291.5
2382487.8
6559839.3
3587.8
AZ24374
70
-80
340.6
2382378.8
6559677.2
3595.8
AZ24375
280
-40
369.0
2383234.7
6559609
3618
AZ24376
250
-76
261.9
2383854.5
6557668
3759.8
AZ24377
250
-70
297.5
2383912.7
6557951.5
3733.8
AZ24378
249
-84
454.0
2383572.8
6558894.3
3656.9
AZ24379
250
-79
365.8
2383672.9
6558661.5
3671.5
AZ24380
250
-69
287.5
2383520.9
6557574.7
3754.9
AZ24381
250
-73
375.1
2383881.6
6558410.5
3744.4
AZ24382
250
-75
385.0
2383812.9
6558493.9
3722.1
AZ24383
250
-75
371.7
2382534.8
6559631
3619.9
AZ24384
70
-72
270.0
2383876
6558413.8
3744
AZ24385
250
-74
250.4
2382677.9
6559044.2
3699.1
AZ24386
70
-66
380.3
2383594.5
6557354.9
3770
AZ24387
160
-75
452.0
2383073.9
6559955.7
3615.8
AZ24388
250
-73
245.3
2383809
6557753.3
3759.2
AZ24389
70
-75
343.3
2383652.7
6558870.2
3668.6
AZ24390
70
-67
338.8
2383672.7
6558661.5
3671.8
AZ24391
218
-37
331.0
2383237.1
6559607.8
3618
AZ24392A
250
-71
324.0
2382488.6
6559841.7
3587.7
AZ24393
70
-74
264.7
2383915.7
6558318.9
3763.5
AZ24394
250
-71
242.3
2383003.5
6558630.9
3681.5
AZ24395A
70
-72
407.0
2383810.6
6558491.4
3722.2
AZ24396
70
-70
497.0
2382951.1
6559736.8
3610.2
AZ24397
250
-73
412.4
2383914.1
6558320
3763.5
AZ24398
250
-75
408.8
2383875.3
6557352.8
3819.4
AZ24399
250
-71
367.9
2383549.7
6558195.1
3737.3
AZ24400
70
-80
227.0
2383849.2
6558833.7
3730
AZ24401
70
-71
324.5
2382979.8
6558834.9
3659.8
AZ24402
70
-79
230.0
2383224.9
6558285.7
3695.7
AZ24403
288
-38
427.0
2383241
6559501
3622.5
AZ24404
70
-80
73.5
2382979.1
6558675.9
3676.6
AZ24404A
70
-80
133.0
2382976.8
6558675.1
3676.4
AZ24404B
70
-80
187.5
2382979.2
6558676.2
3676.5
AZ24405
70
-70
317.6
2383898.7
6558212.1
3758.5
AZ24406
5
-73
324.2
2382428.7
6559844.6
3584.9
AZ24407
70
-75
259.0
2383947.8
6558123.8
3772.9
AZ24408
250
-73
313.5
2383123.5
6558887.3
3652.9
AZ24409
70
-71
270.0
2383325.1
6560123.8
3637
AZ24410
70
-74
241.0
2383810.2
6557751.3
3759.3
AZ24411
250
-75
334.0
2383900.6
6558211.4
3758.5
AZ24412
250
-77
297.5
2383951.4
6558124.2
3773.1
AZ24413
70
-71
317.0
2383520.4
6559350.7
3679.3
AZ24414
270
-48
415.6
2383225.1
6559738
3619.7
AZ24415
70
-70
346.0
2383245
6560206.7
3679.7
AZ24416
250
-75
201.0
2380165.6
6563489.6
3660.7
AZ24417
250
-67
253.7
2383846.3
6558100
3721.4
AZ24418
70
-77
329.0
2383458.5
6558159
3714.9
AZ24419
70
-73
248.0
2383934.6
6557799
3756.1
AZ24420
70
-72
130.2
2383908.7
6557896.2
3737
AZ24421
259
-62
229.0
2383234.5
6559560.4
3621.3
AZ24422
250
-35
236.2
2383244
6559487.3
3620.8
GTK2424
240
-60
152.8
2383264.4
6558036.3
3715.5
GTK2424B
240
-60
272.9
2383267
6558032.5
3715.7
GTK2425
60
-60
300.0
2383748.7
6558200.4
3706.7
GTK2426
60
-70
400.0
2383250.9
6559528.2
3623.5
GTK2427
60
-65
250.0
2383595.5
6558686.7
3667
GTK2428
0
-90
100.2
2383357.8
6558607.9
3682.7
GTK2429
0
-90
100.0
2383198.9
6559061.2
3662.6
GTK2430
240
-65
125.0
2383142.9
6558538.2
3676.3
GTK2430A
240
-65
300.0
2383142.1
6558540.1
3676.3
GTK2431
340
-65
400.0
2382804.6
6559687.8
3607.7
GTK2432
170
-65
350.0
2383672.8
6557811.5
3784.3
OBS-MW-1
0
-90
519
2383457.9
6560277.3
3636.7
OBS-MW-2
0
-90
401
2383284.9
6559630
3627.1
OBS-MW-3
0
-90
332
2383569.5
6558052.6
3777
OBS-MW-3A
0
-90
542
2383570.4
6558052.5
3776.8
OBS-MW-4
0
-90
404
2382888.5
6559379
3633.9
Coordinates listed in Table 2 based on Gauss Kruger – POSGAR 94 Zone 2
Advertisement 17
This advertisement has not loaded yet, but your article continues below.
Article content
CAUTION CONCERNING FORWARD-LOOKING STATEMENTS
This news release contains certain forward-looking statements and information, including “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this news release, McEwen Mining Inc.’s (the “Company”) estimates, forecasts, projections, expectations, or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, effects of the COVID-19 pandemic, fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, the ability of the corporation to receive or receive in a timely manner permits or other approvals required in connection with operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves, and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining’s Annual Report on Form 10-K for the fiscal year ended December 31, 2023, and other filings with the Securities and Exchange Commission, under the caption “Risk Factors”, for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement.
Advertisement 18
This advertisement has not loaded yet, but your article continues below.
Article content
The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management of McEwen Mining Inc.